- Moisture Proof & Dustproof Storage:This rice storage container with double silicone rings, one on the container cover and one on the flap lid, making it completely moisture proof and dustproof. A built-in case on the cover allows you to put desiccant in it for better storage. (Desiccants NOT included.)
- Light Blocking & Storage Viewing:The non-transparent food storage bin effectively blocks sunshine and other light source to keep your dry food in better condition. A small viewing window in the front allows you to see clearly when your food storage is reaching the bottom so you can refill it timely.
- BPA Free & Food Grade Material:Cereal storage containers are made of PS , BPA free, which have a longer life than many other brands plastic containers. Clear containers make it convenient to see what’s inside, you can easily get what you want without opening every container
- Storage for All Kinds of Dry Food:This 6.9Qt/11lbs/5kg food storage container is not limited to rice. It's large enouth for storaging a variety of dry food including grain, flour, cereal, soybeans, spaghetti, corn kernels, etc. It can also be used as a pet food dispenser for dogs and cats. It's storage option for anything you find suitable.
- Separatable for Easy Cleaning:The food storage bin and its cover can be easily separated when you need to clean it or refill food into it. Its rounded corner design leaves no dead end for cleaning, making sure your food can be kept in a good condition without impurities hiding in the corners.
- Odor-Free & Safe PS Material :Made from food-grade PS (polystyrene), this food container is completely odorless, ensuring your food stays fresh without any unpleasant plastic smell.